Investments
R&D Steps
| |
Collector I |
|
Collector II |
|
Final optimisation |
|
Power plant
|
| |
- Concrete Structure
- Mirror
- Tilting Mechanisms
- Assembly
|
|
- Air as Thermal Fluid
- Thermal Storage
- Receivers
|
|
- Prototype setup
- Flux simulation
- Flux measurement
- All test and measurements carried out by PSI and ETHZ
|
|
-Final Design
- Mirror welding
Machine
- Final drawings
- Optimisations
- Geological survey
|
| |
T 1
Completed in
September 2007
1.5 MCHF
|
|
T 2
Completed in
September 2008
1.5 MCHF
|
|
T 3
Completed in
July 2008
2.0 MCHF
|
|
T 4
Scheduled for
October 2008
3.0 MCHF
|
|