Investments

R&D Steps

  Collector I   Collector II   Final optimisation  

Power plant

 


- Concrete Structure
- Mirror
- Tilting Mechanisms
- Assembly

 


- Air as Thermal Fluid
- Thermal Storage
- Receivers
 

 


- Prototype setup
- Flux simulation
- Flux measurement
- All test and measurements carried out by PSI and ETHZ
 

 


-Final Design
- Mirror welding
Machine
- Final drawings
- Optimisations
- Geological survey
 

 
T 1
Completed in
September 2007
 1.5 MCHF

 
T 2
Completed in
September 2008
1.5 MCHF 
 
 
T 3
Completed in 
July 2008
2.0 MCHF 
 
 
T 4
Scheduled for
October 2008
3.0 MCHF